Probability Inputs
IDO Production Order granted
The core proposition“The entire dispute reduces to one question: how much premium did Aegon actually receive? That figure, applied to the contractual rate, determines precisely what commission Harrison is owed. Aegon has the answer, admits it has the answer, and refuses to give it. No innocent party withholds the evidence that proves its innocence.”
Expected Recovery Value
$0
Conservative
$0
Base
$0
Favourable
$0
Overall Win Probability
0%
Contract OR-gate
Near-certain at base values — this is correct & structural. Focus on EV and P10 floor.
Deed SJ Probability
0%
P2 × P4 Route A
Settlement Floor
$0
P10 worst-case
SAI Index
0.00
Structural asymmetry
EFI Index
0.00
Evidence fragility
Joint Failure
0%
All 3 streams fail
Expected Recovery: P2 (Deed/SJ) × P4 (Route A) — base inputs
Shapley Value Decomposition — Driver Ranking
Settlement Corridor
Base EV (expected recovery)—
Pre-filing—
First Directions Hearing—
After IDO / Discovery—
Post-Evidence—
Trial (BATNA Floor)—
Stress Floor Analysis
Scenario A — Stressed OR-gate (E inputs at 30%)—
Scenario B — Correlated Collapse AND-gate (extreme lower bound)—
Structural asymmetry gap (A minus B)—
P10 settlement resistance floor—
Joint failure probability (all 3 streams)—
Innocent-explanation probability (0.0001% cap active)0.0001%